Shared Video from ATV Maine

http://www.youtube.com/watch?v=kpw4wbPG3nM&feature=mfu_in_order&list=UL

The above link is a Video taken of our area.  Thank you ATV Maine for sharing.

CLUB MEETING 07/10/2011

Flagstaff Area ATV Club Meeting

July 10, 2011

Authors Peter and Nancy Wagner

1.)  Meeting brought to order with the Pledge of Allegiance at 10AM 17 members present

2.) Presidents Report:  Don Plante

  • Family Fun Days was a success for the club.
  • Thanks to Ray & Nancy, Pete & Edie, Neil & Lorraine, Dick and Ruthanne and Phil , we appreciate your hard work
  • Congratulations to Nancy and Peter for winning best ATV in the parade
  • July kids ride will be on July 27 with a rain date of July 25th watch the weather. Ride leaves Pine Parking Lot at 9Am and the kids have to be back at 2.  Bring your own lunch and helmets will be provided to the kids and members should also wear their helmets.  Any member wishing to give a child a ride please call Don Plante at 246-5947
  • Club ride to Tim Pond Camps for Lunch will be August 27th.  Turkey Pot Pie for lunch $15.00 per person.  All are welcome please contact Don Plante 246-5946 if you would like to attend
  • Motion passed and  carried to donate $250.00 to the Rec Program for a projector
  • Membership voted not to do Pine State Show this year we will revisit it next year
  •  

Membership Secretary:  Ruthanne Smith faatv.me@gmail.com for club questions or dooer@roadrunner.com

  • We have 230 paid members at this time
  • New E-mail

Treasurers Report:  Bob Dennett rdennett@maine.rr.com

  • All bill are paid to date
  • Will transfer $1500.00 to trail fund for work and supplies on Cathedral Pines Boardwalk
  •  

Trailmaster Report:  Dick Smith faatv.me@gmail.com for club question and information or dooer@roadrunner.com

  • June 16th Don and I rebuilt the 32′  boardwalk on the Natanis Trail and delivered planking on the Natanis Trail
  • June 17th Ray, Pete, Lee and I replaced a 16′, 10′ and 6′ bridge on the Natanis Trail
  • June 21st Don checked out Bradbury Brook and decided it was ok to open it
  • June 24th Neal and I checked measurements for the bridge on Tea Pond Trail and put up a Moose Loop sign on the Plum Creek Road
  • July 1st I rode the Butler Brook Trail, opened it and put in sign posts.  Richard and Michael Korhonen and Mike Thompson repaired broken planks on the Pine Boardwalk

July 4th Don and I put a 20″ culvert donated by Andy Brann of Absolute Services on the Tea Pond Trail.  Don Posted signs at Chuck Estey’s brook crossing, 2 kids had torn it up with ATV’s

  • July 5th Don and I picked up 4 telephone poles at CMP
  • July 6th I took the excavator to the Tea Pond Trail and started clearing the slash
  • July 7th I delivered beams for a bridge on Tea Pond Trail and continued clearing slash
  • July 8th Neal and I repaired 4 broken box culverts destroyed by a truck on Eustis Trail
  • July 9th Don, Bob Smith, Pete, Phil, Jeff Bureau, Neal, Jeff Mercer and I built a 12′ bridge on the Tea Pond Trail and finished clearing the trail.  We then went to the Pines boardwalk and cut cribbing to prepare for rebuilding it
  • There is now a trail open to the Trails End Steakhouse in Eustis, they’re looking forward to serving ATV riders

 

  • New Business:  Sandi Isgro Vice President whwolf@tds.net
  • 300 Moose Loop signs are out on the trail, thank you trailmasters and signers
  • Something to think about, we have the opportunity to pass out information at the Kittery information booth.  Do we want to do this??
  • Suggestion to recognize members for 5 yr, 10yr etc..
  • Don will discuss “right of way” pedestrians and ATV on the boardwalk with the Cathedral Pines Ass.

Meeting adjourned at 11:10AM

Next Meeting August 14th

MEETING 06/12/2011

Flagstaff  Area ATV Club Meeting

6/12/11

Authors Nancy & Peter Wagner

1.) Presidents Report: Don Plante Email Out of Order

  • Meeting brought to order at 10AM with the Pledge of Allegiance
  • 19 members present
  • The club received thank you letters from both FABA and Sugarloaf for donations the club had made
  • There are 3 1/2 books of lobster tickets left.  The drawing will take place on Saturday PM at Family Fun Days
  • All members are encouraged to participate in the Fun Days Parade. The theme is Mardi Gras.  Dust off your beads, feathers and masks and lets all have a great time.  We will assemble at 10 AM at the CMP garage for a start time at 11 AM.  The club will also be offering our famous strawberry shortcakes as well as our mouth watering doughboys.  Both treats sell out fast so get in line early
  • July 27th is the date for the kids ride.  Drivers are to assemble at the parking lot in Eustis in time for departure at 9AM prompt.   The kids have to be back by 2 PM .  You are to bring your own lunch this year. The rain date for the ride is the 28th.
  • The Landowners Appreciation Day is set for September 10th.  We will have the same site as last year at site #1 at the Cathedral Pines Campground on Eustis Ridge Rd.  The menu this year will consist of chicken, ribs, hot dogs and hamburgers.  Our September meeting will be held at the picnic on Saturday instead of the next day at the Community Center as previously announced

2.) Vice President Sandi Isgro  Absent

3.) TreasurerBob Dennett  Absent

  • Bob was riding in the Tour De Cure for Diabetes in Kennebunk
  • Don reported for him the we are in good shape with all bills paid
  •  

Membership Secretary: Ruthanne Smith Dooer@tds.net

  • At this time we have 222 paid members
  •  

Trailmasters Report:  Dick Smith Dooer@tds.net

  • May 18,  19, 20, 22 Neal, Don and I checked out the trails and decided to close Bradbury Brook, Butler Brook, and End of Lake Loop for Memorial Day weekend.  As of now of the three, only End of Lake has reopened
  • May 21st Ray, Pete and Lee rode and cleared the Natanis Trail.  3 bridges need to be replaced
  • May 23rd I took the excavator to Bag Mtn and put in water bars and pulled rocks
  • May 24th I took the excavator to the Salt Shed trail and drained the abandoned beaver bog, put the big culvert back in, pulled rocks and did more drainage and water bars
  • May 25th I took the excavator to Caldwell Rd and back filled the road crossing and went to the parking lot and ditched the hill and filled the washouts
  • May 27th I took the excavator to the south side of  Tim Pass and fixed the washout with the help of Nils Bryant who then checked out the remainder of the Pass trail.  I also put in water bars to the top and cleared a parking area.  On the way out I picked up the big iron stove that had been dumped out there and took it to the dump.  Ray and Pete cleared bushes on the Natanis Trail 
  • May 28th Ray, Pete, Ken and Lee removed 10 large trees that had been blown down by the storm
  • May 29th Ray and Nancy, Pete and Edie and Ken and Tammy cleared water bars and directed the water to the side of the trail.
  • I signed some of the Moose Loop in the truck, then took the excavator to the Stratton intersection and fixed the washout.  I got a $20 donation from a rider for the club.  The front idler bearing ended up going.  The excavator is down at this time.  The idler is being rebuilt
  • May 30th Don tore up the spare boardwalk on the Pines trail, we can still make use of the lumber.  Ray, Pete and Lee cut up downed trees on the Natanis Trail
  • May 31st Don did some signing
  • June 1st Don cleared part of Bradbury Brook.  Don and I picked up a lift of lumber
  • June 2nd I delivered planking to the Natanis Trail
  • June 3rd Don, Ray and I replaced the snowmobile bridge on the Natanis Trail
  • Ruthann and I met with 4 people from Connecticut at the Cathedral Pines campground.  They were having a great time ATVing for the 1st time for 3 of them.  They loved our area and were thrilled to see moose on the trail, that was a priority of theirs
  • June 4th Don, Ray, Pete and I built 3 waterbar bridges wide enough for the snowmobile groomer on the Natanis Trial
  • June 10th Neil and I signed the Moose Loop to Rangeley and rode Tim Pass.  The trail to Alder Stream is closed.  The Penobscot forester says it was not him, I will contact AFM
  • June 11th Neil, Jeff and I put in sign posts and signed

 

The meeting adjourned at 10:55

MEETING 05/15/2011

Flagstaff Area ATV Club Meeting

May 15th, 2011

Authors Peter & Nancy Wagner

1.) Presidents Report:  Don Plante damp@tds.net

  •  Meeting brought to order at 10AM with the Pledge of Allegiance
  • 20 members present
  • Please buy Lobster Raffle tickets $5.00 each drawing June 25th Family Fun Days
  • We will be having our strawberry shortcake and funnel cake booths at the Fun Days
  • ATV Maine-Our insurance will cover rides and events
  • Our club annual report is due to the State by June.  Don & Bob will take care of getting this done
  • Thanks to Elaine Marcoux for bringing a cherry coffeecake for us to enjoy

2.) Treasurers Report:  given by Don Plante

  • All bills are paid.  No bills pending

3.) Vice Presidents Report:  Sandi Isgro whwolf@tds.net

  • I will be at Tranquility Inn Tuesday to present ” The Moose Loop” to the Maine Tourism Bureau Representative.  Don, Dick and I will be there to answer questions and promote our club trails

4.) Membership secretary: Ruthanne Smith Dooer@tds.net

  • 199 paid members

5.) Trailmaster Report:  Dick Smith Dooer@tds.net

  • April 11th Don and I went to Augusta to the workshop meeting on the 7 day permit.  They voted to charge $53.00 for it and added a fine of $250.00 for not registering your machine.  It goes into effect in 2012.
  • May 13th I went to Halfway Brook on the Natanis Trail and took out the post to open the trail for maintenance to begin
  • May 14th I went to Kingfield for a Best Management Practices workshop on trail construction.  It was offered by the Kingfield Quad Runners and the Bureau of Parks and Lands
  • I will be getting out on the trails this week to check the signs and any work that may need to be done.  The trails are closed at this time with the opening date set for may 28th conditions  permitting
  • One of our landowners, club member Chuck Estey has been hurt in a work related accident.  We wish him well and a speedy recovery

6.)New Business

  • John McCatherine and Neil Trask stated
  •  Carrabassett Club President said they have been in contact with their landowners and will be working on their trails to open soon in conjunction with ours
  • Landowners and Members cookout & Meeting, Don will ask Cathedral Pines for Sept. 10th
  • Tim Pond Ride needs to be scheduled for Lunch in August
  • Cathedral Pines has a new area for camper with ATV trail access

Meeting adjourned at 10:55

APRIL MEETING 04/10/2010

FLAGSTAFF AREA ATV CLUB MEETING   4/10/11

Authors Peter & Nancy Wagner

1.)  Meeting brought to order at 10AM with the Pledge of Allegiance by Don Plante damp@tds.net.  Till further notice please use Dooer@tds.net for any inquiries, Don is having computer issues.  17 members present and 2 guests

2.) Presidents Report:  Don Plante

  • The club received a thank you from the Pine Tree Society
  • Motion made and passed to give the Pine Tree Society $75.00 again this year
  • We received a request for  the Sugarloaf  Marathon for a donation, a motion was made and passed to give them $50.00
  • A thank you was received from FABA for doing the Winslow show
  • FABA family Fun days is June 24,25,26
  • FABA asked for a donation, motion was made and passed to give them $100.00
  • We will be in the same area again this year for shortcake and doughboys
  • Stratton recreation Summer program contacted us  for the kids ride on Wednesday July 27.  A motion was made and passed to take the kids on a ride again this year.  The rain date will be July 28th
  • There was talk about giving the associated member a discount rate, this will be thought about and discussed at the May 15th meeting
  • We have new shirts, caps, vests, and hoodie sweatshirts for sale.  See STORE for merchandise
  • The new kickoff date for the Moose Loop Trail  is June 25th in Rangeley, Sandi Isgro will be there to represent our club. Senator Olympia will also be present
  • The club is looking into a ride on part of the Moose Loop Trail on June 26th
  • Motion made and passed to give Bob Dennett $100.00 for the Tour de Cure ride for diabetes
  • The toy ride will be September 24th

3.)Vice President Report:  Sandi Isgro whwolf@tds.net

  • Absent

4.) Treasurers Report:  Bob Dennett rdennett@maine.rr.com

  • All bills have been paid

5.)  Membership Secretary:  Ruthanne Smith Dooer@tds.net

  • At this time we have 178 paid members.  Once again I want to thank everyone for the support they are showing for our club.  The more support we have , the more we can accomplish

6.)  Trail Master Report:  Dick Smith Dooer@tds.net

  • March 18th &19th Don and I set up for the Sportsmans Show in Winslow.  Friday was a little slow, but Saturday was busy.  We spoke with lots of people.  Saturday PM Phil Hill and Jeff Bureau took over and said is was very busy.  Sunday Ray and Nancy Charest and Pete and Edie Manter manned the booth. they were also very busy during the midday
  • March 21st Don and I went to the White Wolf for a meeting with the High Peaks Alliance on the Moose Loop Trail
  • March 26th Don and I did a TV interview on WSKI  at Sugarloaf. We spoke about the club and new Moose Loop Trail
  • March 31st I went to a county commissioners meeting in Farmington on the availability of  TIF  funds for trails.  I want to try to get some funding for the Caribou Pond Loop.  There is approsimately $27,000 Plus or Minus available.   It  looks like there is a good possibility that we could get some
  • April 4th  Don and I went to Augusta for a meeting on Bill LD175.   That is the 10 day permit that Don has been working on with one  of the representatives.  Don spoke in favor of it as did the lobbiest from ATV Maine
  • I am still waiting to hear from the land owners on the new connector trail that I have requested
  • We have access into Eustis Village and Trails End is a new sponsor

7.)   GuestSpeaker:  Western Maine Representative for ATV Maine  Mike Worthley

  • Showed us a map of  approved ATV trail in the State of Maine
  • Showed us new numbered signs  that will designate North and South trails by odd numbers East and West by even numbers
  • Shared upcoming ATV events for Roxbury ATV riders club and Westerm Maine ATV clubs see club links
Mike Worthley and Richard Smith

Next Meeting will be May 15th

MARCH MEETING 3/13/2011

Flagstaff Area ATV Club Meeting

March 13, 2011

Authors Nancy & Peter Wagner

1.) Meeting brought to order at 10 AM with The Pledge of Allegiance by president Don Plante. 23 members present

2.) Presidents Report: Don Plante damp@tds.net

  • Stratton PTC thanks the club for donation
  • Western Maine Toy Ride also thanked the club
  • Life Flight–We have 4 marked areas for landing the life flight. Emergency medical teams can now get to our trails
  • We have insurance through ATV Maine.  Reminder that if you are working on the trails put up signs letting riders know that there is work being done up ahead
  • Don has been working on a 10 day registration with the state & ATV Maine.  State has increased the fine for unresistered machines to $250.00.  LD-175 is the bill number that would alow the 1o day registration.  Please support it.
  • Lobster Bake Raffle–thank you Emerson Dyer for printing the tickets.  Tickets on sale for $5.00.  Winners receive 20 lobsters,  5 pounds of potatoes and 10 ears of corn.  Drawing is on June 25 at Family Fun Days
  • Winslow Sportsman Show is March 18-20.  25 Vertie Drive, Winslow, right off 201 Sukee Event Center  Friday 1-7, Saturday 9-9 and Sunday 9-5.

3.) Vice President Report:  Sandi Isgro whwolf@tds.net

  • Premiering Moose Loop new connecting trail around Franklin County–Maps are on sale $4.00.  Trail signs are being made.  There will be a kick off on June 25th in Rangeley at the Country Club.  Senator Olympia Snowe will be in attendence.  More info to follow.
  • Sweatshirts, hats and hooded sweatshirts will be ordered for sale

4.) Bob Dennett rdennett@maine.rr.com

  • Pine Tree Society $100 donation
  • $200.00 for Web Hosting — paid
  • We are in good shape for the upcoming season
  • $2500.00 transferred to the trail fund
  • Money allocated to pay for a new trailer built by Dick.  Thank you

5.) Membership Secretary:  Ruthanne Smith Dooer@tds.net

  • I want to thank everyone that has returned their applications, as of Friday 3/11/11 we have 77  paid members and I made a deposit of $1,375.00 which included 77 members and many donations.  Due to the cost of postage there will be only 1 newsletter sent out to all past members. Please send in your memberships  as soon as possible.  I do want to mention that in addition to membership cards, stickers and maps they will also receive membership in ATV Maine.  They provide $2500.00 in accidental death and dismemberment insurance for primary members and their immediate family as well as all supporting businesses.  Another benefit is that they also offer liability and event insurance to all affiliated clubs.

Trail Master Report:  Dick Smith Dooer@tds.net

  • February and March I contacted Wagner, Plum Creek and AFM for 4 different connections to our trail system totalling approximately 11 miles.  Have heard nothing yet
  • March 5th I got the bucket back for the excavator.  It has been rebuilt, hard welded and has 4 new replaceable teeth.  It has been repainted, the oil changed and a new battery.  There is a bogie wheel to be fixed.   I built a small trailer to put the excavator on with hopes to pull it behind the Rhino.  
  •  I have to have 1 chainshaw worked on at brady’s and change the oil in the Rhino.
  • I have 5 property permits to renew
  • I have received a call from Nadine at Sugarloaf  WSKI TV to do a live interview on Saturday March 26th at 8:30 PM  She also inquired if it would be possible for Don to join me. 
  • We had Life Flight come up here and meet with the ATV club and Arnold Trail Snowmobile club and the game wardens and fire dept.  We went for a ride and established 2 new rescue zones one of which is on our trail system.  JR is also sending signs for 3 more of our rescue zones

Meeting adjourned at 11AM

Next meeting will April 10th at 10AM

Minutes are usually published within 2 days of the meeting date.

OCTOBER MEETING – 10/10/10

Flagstaff Area ATV Club Meeting 10/10/2010

October 11th, 2010 Authors Peter & Nancy Wagner

1.) Meeting brought to order at 10AM with the Pledge of Allegiance by President Don Plante damp@tds.net

  • 21 members present
  • Don gave thanks to the following:  Sandi, Peter & Nancy, Neal and Dick, Ruthanne for Eclectic Treasures, Bob, Don
  • Election of Officers:  motion made to keep the same officers motioned and passed
  • Appreciation Day was a success, voted to do it again next year
  • Tim Pond ride a great success
  • Check sent to Pine Tree for show for next year at Waterville
  • Club voted for meetings to be at the same time next year, 2nd Sunday of month at the Community Building
  • Toys for Tots successful, 339 machines, Dunkin Donuts donated 20 dozen donuts
  • Approval for Black Moose Run Loop, motioned and passed
  • Stratton Elementary School asked for sponsorship, motion passed for $100.00 donation for Christmas craft fund raiser

2.) Membership Secretary: Ruthanne Smith Dooer@tds.net

  •  238 paid members
  • $351.00 into club account from Eclectic Treasures
  • There will be an indoor yard sale at the community Building sometime this Winter

3.) Treasurer’sReport: Bob Dennett rdennett@maine.rr.com

  • We are in the black in good shape with grant money still to come in
  • Motion made to order clothes for spring show

4.) Trail Master report: Dick Smith Dooer@tds.net

  • Sept 15th I cut open the trail between the roads on Butler Brook
  • Sept 16th took the excavator to Butler Brook and pulled rocks, moved slash and graded
  • Sept 17th Neal and I explored Delaware Gap from the AFM side.  It was extremely difficult.  I have since found out that there is another old road, we will look at it
  • Sept 18th we had landowners appreciation day.  Forty eight people showed up with six landowners
  • Sept 19th I went to the powerline that comes into Stratton to change the trail to the new powerline
  • Sept 20th I signed Butler Brook
  • Sept 21st I pulled rock, put in waterbars and drained the big waterhole on the Stratton Powerline
  • Sept 22nd I finished pulling rock and doing waterbars on the Stratton powerline
  • Sept 23rd I delivered the telephone poles to the Butler Brook Bridge site
  • Sept 24th Neal and I put the poles in place and added the crosspieces to the bridge
  • Sept 25th Neal, Jeff and I finished the bridge on Butler Brook Loop and added more signs
  • Sept 27th I delivered planking and cribbing to the Butler brook boardwalk site
  • Sept 29th I brushsawed the trail to the boardwalk and delivered more planks
  • Sept 30th  I hauled cribbing and planks into the site
  • Oct 1st Neal and I built 64 ft of boardwalk
  • Oct 3rd I repaired the “Jeep Damaged” new bridge and dug jeep stoppers and put in waterbars on the Butler Brook Loop
  • Oct 4th I put ramps on the Butler Brook Boardwalk
  • Oct 5th I repaired 3 broken box culverts damaged by a jeep on the End of the Lake Loop
  • I want to remind riders that Alder Stream is now closed, the Natanis Trail will be closed at Bugeye on Oct. 30th.  All other trails will remain open until the first groomable snow.  The Rangeley Trails will close on Nov. 1st

Meeting adjourned   See you all next year!!!!!!!!!!!!!!

TIM POND CLUB RIDE – OCTOBER

SEPTEMBER MEETING 09/12/2010

Flagstaff Area ATV Club Meeting 09/12/2010

September 13th, 2010 Authors Nancy and Peter Wagner

1.) Meeting brought to order at 10AM by President Don Plante damp@tds.net

2.) Presidents Report:  Don Plante

  • Opened the meeting with the Pledge of Allegiance
  • 20 members present
  • Thank you from Millie Howard, the kids of the Rec. Dept. really enjoyed their ATV ride.  A big thank you for your donation to help us go rafting.
  • Sept. 18th Appreciation Picnic – All are wellcome to attend.  Site#2 Cathedral Pines 11AM.
  • Club Ride October 2nd to Tim Pond Camps $12.oo for lunch.  Rain or Shine We will leave from the big parking lot near Pines Market at 9AM.  Call Don Plante if you plan to attend 246-5946
  • Sept. 25th Toys for Tots Ride- Meet at McDonalds in Jay 7:30 or at Whistle Stop in Farmington 9AM.  Ride goes to Canton.  Motion made and carried to donate $150.oo to this charity
  • ATV insurance on the equipment $345.00 Paid
  • ATV Maine does now have an insurance policy for the clubs.  Motion made and carried to get the insurance
  • Pine Tree Sportman Show will be held at the Armory in Waterville March 18th, 18, 20th  $295.00 for a booth.  Barry Crafts will donate a pig roast to raffle.
  • Final Meeeting Oct 10th officers election.  If anyone is interested in these positions please bring your name to Don.

Vice President Report Sandi Isgro whwolf@tds.net

  • New Black Moose Franklin Co. ATV loop – Motion made and carried to have an ad on the map

Treasurers Report  Bob Dennett rdennett@maine.rr.com

  • The grant has not been applied for yet.  So this money will be coming in
  • All bills are currently paid and we will be in good shape to end the year in the black!!!

Membership Secretary Ruthanne Smith Dooer@tds.net

  • 235 paid members
  • Our fundraiser at Eclectic Treasures will continue into mid October.  I want to thank everyone that has donated or purchased items to benefit our cause.  This past week I put an article in the Irregular to encourage people to come in and brouse

Trailmaster Report  Dick Smith Dooer@tds.net

  • August 9th I went to Mexico for a best management practices workshop
  • August 10th I rocked the muddy spotts at Northwest inlet on the Antler Hill Trail
  • August 11th I spread gravel on the Pines Trail
  • August 13,14,15,16,17,18 I spread rock and gravel on the Eustis Trail
  • August 26th I repaired 2 broken planks on the Pines Trail
  • August 27th I went to Carrabassett and pulled rocks and made waterbars on the Kingfield part of their trail
  • August 30 and 31st I spread rocks and gravel on the Eustis Trail
  • September 1st I fixed broken planks on 3 box culverts
  • September 2nd I pulled rocks and did waterbars on the Eustis Trail
  • September 3rd and 4th Neal and I went to Indian Stream to get a GPS reading on that end of Delaware Gap, its a little over 2 miles thru it
  • September 7th I pulled rocks and put in waterbars on teh Eustis Trail
  • September 8th I pulled rocks and put in waterbars on the Brochu Trail and dug a pit to prevent the outlaws from riding in the river
  • September 9th I pulled rocks and put in waterbars on teh Salt Shed Road
  • September 10th I went to the SFT side of Brochu bridge taril and pulled rock adn put in waterbars
  • At this time I need to mention that our trails close at the first Groomable snow with two exceptions.  Alder Stream which includes part of the Sawyer Brook Loop will be closing Sept.15th and the Natanis Trail will be closing October 31
  • September 11th signed and numbered intersections, repaiered broken planks on Pine Trail

Flagstaff Area ATV Club Meeting-8/7/2010

Flagstaff Area ATV Club Meeting 8/07/2010

August 8th,2010 Authors Peter & Nancy  Wagner

A very informal meeting was held in the parking lot at the Pines prior to the ATV’s ride to Rangeley. 25 members present

1.) Presidents Report:  Don Plant damp@tds.net

  • The Tim Pond Ride can either be on Sept. 11 or 25th.  Lunch is $12.00 Dinner 20.00  Looking for feedback from members
  • ? Do we need another canopy.  Motion made  and carried to buy another canopy for functions
  • We have 1/2 million dollar insurance coverage.  Nothing for speed events
  • September 18th is the landowners & members get together, site#2 on Eustis Ridge Road
  • Meeting on August 17th  High Peaks Alliance in Kingfield at the Herbert Hotel at 7PM
  • August 8th  Roxbury Best Management Practice Workshop 8-12
  • Stratton Rec Program is looking for donations for kids to go whitewater rafting. Cost $30.00  for overnight stay, rafting and pizza party.  A motion was made and carried to give the Rec Dept $250.00

2.)  Vice President:  Sandi Isgro whwolf@tds.net    Absent

3.)  Treasurers Report:  Bob Dennett rdennettt@maine.rr.com   Nothing to report

4.) Membership Secretary:  Ruthanne Smith Dooer@tds.net

  • As of today our paid membership stands at 231.  I have to thank everyone that has donated items for our “Eclectic Treasures”.  I have held in reserve $40.00 cash that I will continue to search for items to purchase for resale.  Total profit for July is $216.40.  We will be continuing our sales efforts until mid October.  Remember, if you have any new or gently used items just drop them off at the White Wolf and I will pick them up to be sold.  Many thanks!!

5.) Trail Master Report:  Dick Smith Dooer@tds.net

  • July 11th Ray, Pete, Phil and Jeff did signing on the Natanis trail.  Ruthann and I staked the Jeep stoppers on the Eustis trail and the Tim Pass Loop
  • July 13th I picked up 5 telephone poles and delivered them to Barnard Pond Rd
  • July14th I put the poles in place, 10 of them across the meadows and spread the cross members
  • July 15th I picked up a lift of lumber from Stratton and started planking the boardwalk at Barnard
  • July 16th I finished the planking of the boardwalk and graded part of the trail
  • July 19th I re-signd the Bridge Road, East Branch Rd. and End of the Lake.  Checked Bradbury Brook, it’s ok to  clear trail thru the slash
  • July 20th I graded the Tim Pond Road end and Sawyer Brook, and widened the corners of the bridge
  • July 21 and 22 I cleared a trail thru the slash on the bradbury Brook Loop.  The trail is now open
  • July 23 and 24 I graded the logging cut on the Tim Pass Loop
  • August 2nd I put in a culvert in the Tim Pass Logging cut and graded the entrance trail to Alder Stream
  • August 3rd I graded the short trail between the King and Bartlett Rd and Flagstaff Rd
  • August 4th I went to Jays pit and drained the water holes and graded and pulled rocks on the Eustis Trail
  • August 5th I went to the boneyard on the Stratton Trail and cleared rocks and graded
  • August 6th Don and I spread gravel on the Pines Trail

Web Advisor Peter Wagner: peterwagner2@tds.net

  • Please continue to send any photos or info you would like added to the site

The Ride to Rangeley was a great success!!! There was 25 members in attendance.  85 miles of fun!! Great  food at the Parkside Main in Rangeley

Next meeting September 12th