Flagstaff Area ATV Club Meeting
10/14/2012
Authors Peter & Nancy Wagner
Presidents Report: Don Plante damp@tds.net
•Meeting was brought to order at ten am commencing with the pledge to the flag.
•Election of Officers: All officers were unanimously re-elected for the up coming year.
•The terms for the Directors are as follows: Phil Hill 2015, Bruce Marcoux 2013, Peter Manter 2014
•Repairs of 3 bridges: Stratton Brook Bridge Concrete blocks were installed. Our share was 584.00 which we paid to the ATSC because they paid the whole bill. Brochu Bridge was redecked and our cost was 1461.20 which was paid to JL Brochu Coplin Bridge Rangeley paid for the concrete blocks and JL Brochu did the repairs.
•Motion made and carried to make a plaque in appreciation for donation of time and equipment & manpower on repairs of these bridges.
•This is our final meeting for this year and our next meeting will be March 10, 2013 ten a.m. at the Community Bldg.
TREASURER REPORT: Bob Dennett rdennertt@maine.rr.com
TRAILMASTER REPORT: Richard Smith dooer@roadrunner.com
•September 11, 12, 13, 14th I spread gravel on the Stratton/Rangeley powerline.
•October 8th We did a ride with WSKI who is doing a video to play this winter on their TV show. There were ten riders and we rode for eight
hours photographing.
•The grant request has been sent in to Augusta.
• The work on the Brochu bridge has begun. A total of ten members from the •Snowmobile and ATV clubs worked on October Saturday 13th and accomplished approximately 2/3 of the job in one day.
Membership Report Ruthann Smith dooer@roadrunner.com
We finished this year with 231 paid members. Our experience at “Eclectic Treasures” these past 3 seasons has proven to be very successful. Our 1st year we made $315.60, the 2nd brought in $327.95 and this year (still not finished) has made $850.95 to date, totaling $1494.50. I want to say thank you to Melody Chase for being so kind to our club by not charging us for the space we occupy at the shop. She has worked very hard in our behalf to make this successful for our club.
In light of our success due to your generosity, I will kindly ask you to remember us when you are cleaning out your attic or changing your styling. Every clean, unbroken item is very much appreciated. Thank you for a wonderful season and we`ll look forward to seeing you all next year.
Year | |
2010 |
$ 315.60 |
2011 |
$ 327.95 |
2012 |
$ 850.95 |
Total | $1,494.50 |
Flagstaff Area ATV Club Meeting
09/08/2012
Authors Peter & Nancy Wagner
Presidents Report: Don Plante damp@tds.net
*A short meeting was called to order.. We welcomed the landowners and club members that were there. We informed the landowners that there wouldn’t be any ATV or Snowmobile clubs without the generosity of letting us have trails on there land. We thanked them for it.
*Thanked our Trailmaster and all the volunteers for the work that was accomplished this past year.
*Congratulations went out to Dick and Ruthann Smith and also Bob and Sally Smith on their wedding anniversary which was yesterday.
*We now have the plates with our decal on it for sale. 30 were ordered and the price id ten dollars each. The club cost was nine dollars. Not many left. Bill was paid for the plates.
*Last month club voted 2000.00 dollars for the purchase of two new tracks for the excavator. These have been ordered and are in with the cost of 846.00 each. The excavator also needs new
pins and bushing on the bucket and new bearings for the idlers. These repairs will be taken care of.
*Another bill was voted on to be paid which is the liability insurance for the club. This is for 550.00 dollars.
*Toy ride this year is Sept.29th. Club voted to give 100.00 dollars towards this event.
*Club hats were given out to the landowners that were present at this outing.
*Next month is our final meeting for this season and this is also election of officers. Anyone interested in one of these positions please contact Don Plante at 246-5946 or Sandy at White Wolf at 246-2922
*Very good turnout for the cookout.
TRAILMASTER REPORT, dooer@roadrunner.com
*AUGUST 13TH I WENT TO THE WINDMILL TRAIL AND DUG OUT THE MUD TO THE HARDPACK.
*AUGUST 17, 18, 19, 20, 21 I FINISHED HAULING SAND AND FILLING
WATERHOLES AND ROCKS ON THE STRATTON/RANGELEY TRAIL.
*AUGUST 22ND I FINISHED THE GRADING, WALKED THE EXCAVATOR OUT AND PUT IN 2 PITS TO STOP THE TRUCKS.
*AUGUST 26TH NEAL BLANEY AND I WENT TO PLUM CREEK RD. AND FILLED A BIG WASHOUT HOLE IN FRONT OF THE NEXT TO THE LAST BRIDGE.
*AUGUST 29TH I WENT TO THE STRATTON POWERLINE AND DRAINED THE ROCKEY WATERHOLE AND PUT IN 2 PIPES TO KEEP IT DRAINED. I THEN WORKED UP THE TRAIL TO THE WASHOUT AND DITCHED AND WIDENED THE TRAIL.
*AUGUST 30TH TOM LAPOINTE AND I GPS`ED THE WINDMILL, BUTLER BROOK, EAST KENNEBAGO AND THE EUSTIS TRAILS.
*AUGUST 31ST I WENT OUT THE FLAGSTAFF RD. TO WHERE BUTLER BROOK CROSSES, PUT IN DRAINAGE DITCHES, GRADED AND PULLED ROCKS. I THEN WENT TO THE GRAVEL PIT AND GRADED THE APPROACH, PUT IN A SIGNPOST AND RECOVERED THE CULVERT. I THEN WENT TO THE END OF THE LAKE, PULLED DEBRIS OUT OF THE BROOK THEN WALKED UP THE TRAIL FILLING HOLES AND COVERING THE CULVERTS.
*SEPTEMBER 2ND I WENT TO TIM PASS AND PUT IN SIGNPOSTS, SIGNED THEN WENT TO THE END OF THE LAKE AND JACKED UP THE BRIDGE AND PUT IN CENTER SUPPORTS.
*SEPTEMBER 3RD I WENT TO THE END OF THE LAKE, BRUSHED IT OUT, REPAIRED BOX CULVERTS AND CLOSED THE ANTLER HILL ROAD AND TRAIL.
*SEPTEMBER 4TH & 7TH I WENT TO THE END OF THE LAKE BOARDWALK AND REPLACED 5 SECTIONS.
Membership Secretary: Ruthanne Smith dooer@roadrunner.com
*AT THIS TIME WE HAVE 231 PAID MEMBERS.
*OUR DEPOSIT THIS PAST MONTH FROM SALES AT ECLECTIC TREASURES IN STRATTON WAS A HEALTHY $244.35. THIS YEAR TO DATE WE HAVE MADE $732.60 FROM ITEMS DONATED TO THE CLUB FOR SALE. THANK YOU FOR REMEMBERING US WHEN YOU CHANGE OUT YOUR STORAGE AREAS.
Last meeting of the year will be October 14, 2012
Flagstaff Area ATV Club Meeting
08/12/2012
Authors Peter & Nancy Wagner
Meeting brought to order by President Don Plante at 10AM with the Pledge of Allegiance
Presidents Report: Don Plante damp@tds.net
Vice President Report: Sandi Isgro Sandi.whitewolf@gmail.com
Treasurers Report: Bob Dennett rdennertt@maine.rr.com
Membership Secretary: Ruthanne Smith dooer@roadrunner.com
Trailmaster Report Dick Smith dooer@roadrunner.com
July 8,9, 10 and 12th I went to Butler Brook and Bradbury Brook, I cleared brush, graded and pulled rocks.
July 13th I picked up 5 culverts and dropped them off at the Bradbury and Butler trails.
July 15th I signed July 16th I graded Bradbury where it parallels K&B Rd. July 17th I walked the excavator a mile and 1/2 and took out the ragged culvert on the Bradbury, Butler trail. I then went to Butler Brook and fixed where the log culvert is, then went to the K&B parking lot and graded the 2 hills on that trail.
July 18th I went to the trail at the end of the SFT rd., dressed up the trail and cleared the brook.
July 19th I went to the top of Bugeye and tried to find enough dirt to fill in between the rocks, no dice.
July 22nd Neal, Mark, Jeff, Don, Bob Smith and I went to mile 7 on the Airport rd and breached the beaver dam that washed out the road. With permission from the Game Warden, we put in pipes to keep the water level down.
July 23rd I went out to the Boneyard and graded and pulled rocks. July 24th I went to the Flagstaff rd. and replaced the bridge on the trail that parallels it.
July 25th I finished nailing the bridge and cleaned up the debris. July29th I took the excavator out to the top part of the Butler Brook trail and put in waterbars and graded. July 30th I went to the other side of the Tim Pond rd. and graded and widened that part of the Tim Pass Loop.
July 31st I took the quad and checked our end of the Carrabassett trail. It is still rough, some like it that way! August 2nd I took the excavator and put in waterbars and filled holes on the Bradbury Brook trail.
August 3rd I took the quad and the brush saw and went to the top part of the Butler Brook trail and brushed out the alders where it was tight. I then went to Alder Stream (Sawyer Brook Loop) put in a sign post then went to Tim Pass and put in another.
August 4th I took the excavator to the Stratton trail and graded. August 7th & 8th I took the excavator to the Windmill trail and started and finished grading the mud section.
August 9th & 10th I went to the Antler Hill end of the Windmill trail and put in 2 pits to keep the trucks out and graded the trail. On my way out I fixed the washout on the Antler Hill Rd.
Flagstaff Area ATV club Meeting
7/8/2012
Authors Peter & Nancy Wagner
1.) Meeting brought to order by President Don Plante ay 10AM with the Pledge of Allegiance. 17 members present
2.)President Report: Don Plante damp@tds.net
4.) Treasurer Report: Robert Dennett rdennett@maine.rr.com
5.)Membership Secretary : Ruthanne Smith dooer@roadrunner.com
At this time we have 219 paid members.
This past month the club has had many beautiful donations to be sold thru “Eclectic Treasures” for the benefit of our trail fund. I want to wholeheartedly thank everyone that has been so generous. It is very much appreciated.
We have received 1000 new stickers and they are colored correctly. We
did business with the Maine Press from Rumford, I was very happy working with them and would not hesitate to recommend them.
6.) Trailmasters Report: Dick Smith dooer@roadrunner.com
·June 9th I went to East Kennebago and finished filling the washout. Ray, Pete and Lee brushed the trail to Natanis.
·June 12th & 14th I went to the Windmill Trail and graded and drained water as far as the Wall Rd.
·June 15th I went to the Antler Hill end of the Windmill Trail and drained and graded.
·June 16th Pete, Ray, Don, Bob Dennett, Joe Gallant, Bob Smith and I replaced the Optional Boardwalk in the Boneyard.
·June 18th I signed the Windmill Trail.
·June 19th & 20th I went back to the Wall Rd and graded the Windmill Trail.
·June 21st I delivered stock to the End of the Lake Trail for boardwalk and culvert repairs.
·June 23rd I went to the End of the Lake, graded, put in one box culvert and tried to put the bridge back into place.
·June 24th I did signing and checked Split Rock Trail. There are ditches and rocks but there is room for us ATV`ers to get around the end of the ditches. They were put there by the landowners to keep the trucks out.
·June 25th I repaired the broken boardwalk on the End of the Lake Trail.
·June 27th I went to the End of the Lake and pulled the bridge back into place. I also cleaned the debris out of the brook. I then drained water out of the Flagstaff Rd, End of the Lake Trail and put in a box culvert.
·June 28th I went to Big Sag Rd and covered 8 culverts and drained 4 waterholes. I then went to Tim Pass and ditched and renewed waterbars.
·July 1st Neal, Jeff and I signed and fixed 2 box culverts.
·July 3rd I went to East Kennebago Rd and put in a culvert.
·July 6th I went to the Butler Brook Trail pulled 1 crushed culvert and buried 6, then went to Green Gate Rd on Tim Pass Loop and put in 1 culvert and buried another.
·July 7th I went to Butler Brook and ditched.
New Business:
Next Meeting August 12
6/10/2012
Authors Peter and Nancy Wagner
Meeting brought to order at 10AM by President Don Plante with the Pledge of Allegiance. 32 members present
President’s Report: Don Plante damp@tds,net
Vice President’s Report: Absent
Membership Secretary: Ruthann Smith dooer@roadrunner.com
Treaurer’s Report:Bob Dennett rdennett@maine.rr.com
Trailmaster’s Report: Richard Smith dooer@roadrunner.com
5/20/2012
Authors Peter and Nancy Wagner
Meeting brought to order at 10AM by President Don Plante with the Pledge of Allegiance. 32 members present
President Report: Don Plante damp@tds.net
Vice President Report: Sandi Isgro Sandi.whitewolf@gmail.com
Treasurer Report: Bob Dennett rdennett@maine.rr.com
Membership Secretary: Ruthanne Smith dooer@roadrunner.com
At this time we have 185 paid members. I want to thank all the members that have donated items to be sold at the Eclectic Treasures for the benefit of our trail fund. Every little bit is a help and very much appreciated. I thank you.
Trailmaster Report-Dick Smith dooer@roadrunner.com
The Pines and Senior boardwalks have both been replaced and widened. I want to thank everyone that helped out with the many hours of work.
April 30th I hauled sand to the trail just beyond the Senior boardwalk.
May 3rd The Natanis crew rode that trail and cut trees.
May 8th I picked up 5 telephone poles and delivered them to the Flagstaff Rd bridge site.
May 9th I hauled more sand to the Pines trail.
May 10th Neal Blaney and I picked up a culvert and installed two pieces on the East Kennebago Rd.
May 11th Neal and I signed the East Kennebago Rd and rode the Tim Pass Loop and cut downed trees.
May 13th Neal and I picked up a culvert and installed it on the Black Mtn Rd.
May 14, 16 and 17 I worked on dressing up the Tim Pass Loop of the trail between Sawyer Brook Rd and Black Mtn Rd.
May 18th I took the excavator to the power line behind Stratton and started cleaning it up.
This past week members have been riding the trails, checking them and cutting downed trees. Again, many thanks for the help.
By the way, we have a beautiful new trail. It is the East Kennebago Rd. It is very scenic and adds 6 1/2 miles of good riding. A big
“THANK YOU” to Wagner Forest Management. I am waiting to hear from Plum Creek about a part of a new trail that we have already been given permission from AFM for their part of it.
Web Advisor-Peter Wagner peterwagner2@tds.net
Please check the Flagstaff Area ATV Club Facebook Page. Many clubs have “friended” the page and there is a lot of information and news that we can not put on our webpage. If anyone has any suggestions or pictures please to not hesitate to contact me to get them added
Also worth mentioning – One of the FAATV founders “Granville ” Carter, a plaque in his honor has been placed at Split Rock.
Metting adjourned at 11:15 Next Meeting Sunday June 10th
Flagstaff Area ATV Club Meeting 4/15/2012
Authors: Peter & Nancy Wagner peterwagner2@tds.net Web Advisor
1.) Meeting brought to order at 10AM starting with the Pledge of Allegiance. 31 members in attendance
2.) Presidents Report Don Plante damp@tds.net
3.) Vice President Report: Sandi Isgro sandi.whitewolf@gmail.com
Moose Loop Meeting – Motion carried to spend $100.00 for Moose Loop Signs
4.)Treasurers Report: Bob Dennett rdennett@maine.rr.com
5.) Membership Secretary: Ruthann Smith dooer@roadrunner.com 207-246-3201
6.)TrailmasterReport: Dick Smith dooer@roadrunner.com
Flagstaff Area ATV Club Meeting
3/11/2012
Authors Nancy & Peter Wagner peterwagner2@tds.net
1.) Meeting brought to order at 10AM by Don Plante with the Pledge of Allegiance and a moment of silence for those who have passed Al Briand and Gene Currie. 27 members present
2.) Presidents Report: Don Plante
3.) Vice President Report: Sandi Isgro whwolf@tds.net
4.) Treasurer Report: Bob Dennett rdennett@maine.rr.com
5.) Membership Secretary: Ruthanne Smith dooer@roadrunner.com
6.)Trailmaster Report: Dick Smith dooer@roadrunner.com
Meeting dates
April 15
May 20
June 10
July 8
August 12
September 8
October 14