Archive for August, 2010
Flagstaff Area ATV Club Meeting-8/7/2010
Flagstaff Area ATV Club Meeting 8/07/2010
August 8th,2010 Authors Peter & Nancy Wagner
A very informal meeting was held in the parking lot at the Pines prior to the ATV’s ride to Rangeley. 25 members present
1.) Presidents Report: Don Plant damp@tds.net
- The Tim Pond Ride can either be on Sept. 11 or 25th. Lunch is $12.00 Dinner 20.00 Looking for feedback from members
- ? Do we need another canopy. Motion made and carried to buy another canopy for functions
- We have 1/2 million dollar insurance coverage. Nothing for speed events
- September 18th is the landowners & members get together, site#2 on Eustis Ridge Road
- Meeting on August 17th High Peaks Alliance in Kingfield at the Herbert Hotel at 7PM
- August 8th Roxbury Best Management Practice Workshop 8-12
- Stratton Rec Program is looking for donations for kids to go whitewater rafting. Cost $30.00 for overnight stay, rafting and pizza party. A motion was made and carried to give the Rec Dept $250.00
2.) Vice President: Sandi Isgro whwolf@tds.net Absent
3.) Treasurers Report: Bob Dennett rdennettt@maine.rr.com Nothing to report
4.) Membership Secretary: Ruthanne Smith Dooer@tds.net
- As of today our paid membership stands at 231. I have to thank everyone that has donated items for our “Eclectic Treasures”. I have held in reserve $40.00 cash that I will continue to search for items to purchase for resale. Total profit for July is $216.40. We will be continuing our sales efforts until mid October. Remember, if you have any new or gently used items just drop them off at the White Wolf and I will pick them up to be sold. Many thanks!!
5.) Trail Master Report: Dick Smith Dooer@tds.net
- July 11th Ray, Pete, Phil and Jeff did signing on the Natanis trail. Ruthann and I staked the Jeep stoppers on the Eustis trail and the Tim Pass Loop
- July 13th I picked up 5 telephone poles and delivered them to Barnard Pond Rd
- July14th I put the poles in place, 10 of them across the meadows and spread the cross members
- July 15th I picked up a lift of lumber from Stratton and started planking the boardwalk at Barnard
- July 16th I finished the planking of the boardwalk and graded part of the trail
- July 19th I re-signd the Bridge Road, East Branch Rd. and End of the Lake. Checked Bradbury Brook, it’s ok to clear trail thru the slash
- July 20th I graded the Tim Pond Road end and Sawyer Brook, and widened the corners of the bridge
- July 21 and 22 I cleared a trail thru the slash on the bradbury Brook Loop. The trail is now open
- July 23 and 24 I graded the logging cut on the Tim Pass Loop
- August 2nd I put in a culvert in the Tim Pass Logging cut and graded the entrance trail to Alder Stream
- August 3rd I graded the short trail between the King and Bartlett Rd and Flagstaff Rd
- August 4th I went to Jays pit and drained the water holes and graded and pulled rocks on the Eustis Trail
- August 5th I went to the boneyard on the Stratton Trail and cleared rocks and graded
- August 6th Don and I spread gravel on the Pines Trail
Web Advisor Peter Wagner: peterwagner2@tds.net
- Please continue to send any photos or info you would like added to the site
The Ride to Rangeley was a great success!!! There was 25 members in attendance. 85 miles of fun!! Great food at the Parkside Main in Rangeley
Next meeting September 12th
